Cimarron Engineering Ltd.

A sample of current and recently completed projects include:

Acres Parsons E&C Conoco Phillips Surmount SAGD
Water disposal, source water and fuel gas pipelines

Chevron - Ells River Pipeline Pre-Feed
Transportation study comparing trucking and pipelining
Preliminary pipeline engineering and cost/schedule estimation

Devon Canada Jackfish SAGD
Materials selection for piping/equipment and corrosion monitoring locations

Enbridge Pipeline -
Fort Hills’ Sturgeon Delivery System
Detailed engineering design for NPS 30 dilbit, NPS 24 SCO and NPS 20 diluent pipelines
Engineering technical support and cold eyes cost estimate review for the Fort Hills and Sturgeon Delivery System

Enbridge Pipelines – Tank 300-18
Tank specification and purchase of 150,000 bbl tank including vapour recovery

Honeywell - Fort Hills Field Auxiliary Shelters
Detailed mechanical, electrical, and structural design for buildings to house the process automation equipment

Krupp Canada CNRL Horizon’s Slurry Processing Plants
Process design and mechanical design of the water and slurry piping systems

O.J. Industrial Maintenance
Siphon Line
2km, 42” siphon line at Suncor’s mine site

Shell Canada –
Orion SAGD Corrosion Manual
Assessment of corrosion threats for all surface facilities

Suncor Firebag Audit Package
Prepare a complete audit package for production pad facilities and pipelines to convert from sweet service specifications to sour service

Suncor Energy HD Pond 5 & 6 to Pond 2 & 3 Piping System
Hydraulic capacity analysis and pump house piping modifications

Suncor Energy
Pump Barge #3 Upgrade
Upgrade and relocation of a three (3) – 700 hp pump barge

Suncor Energy
MFT Line Replacement
Replacement of 30” MFT pipeline

Suncor Energy Tailings Line Extensions
BRFT pipelines extended and water pipelines

Suncor Energy – HT-5 Hydro Transport Pipeline
11km, 24” relocation and replacement

TransCanada PipeLines - Fort MacKay Extensions
24” and 30” gas pipelines for the Fort Hills section
24” gas pipeline for the Horizon extension
24” gas pipeline from Syncrude to the Aurora Plant